Contacts
Dr. Melissa Hill
Assistant Director Environmental Health & Safety
210.354.9307
Ismael (Rick) Pena
Asbestos / Environmental Technician - Texas DSHS licensed asbestos inspector & supervisor
210.354.9307
Asbestos Management Plans (AMPs)
- Are required to be on-site and available to staff, parents/guardians, and contract workers.
- Are specific for each campus and are maintained in a red binder either within the campus library,
main office or other designated (accessible) location.
- Includes:
- Tab 1: AMP notifications including the campus availability notice
- Tab 2: Latest 3-year asbestos re-inspection
- Tab 3: Six-month asbestos surveillance reports
- Tab 4: Asbestos sample reports / ACM sample logs
- Tab 5: Training certificates for SAISD Texas licensed / trained personnel
- Tab 6: Response activities involving the abatement or repair of ACM
- Tab 7: A CD with the all the campus asbestos related documentation including but not limited
to: the original asbestos inspection, records of past 3-year asbestos re-inspections, past 6-month
asbestos surveillance, past asbestos abatement work, etc.
- Should be consulted prior to any maintenance, remodeling, and/or renovation work at the campus
that may disturb known or suspect asbestos-containing material (ACM).
- Are reviewed and updated as at least every three years. Environmental Programs personnel are
responsible for providing campus AMP updates.
Asbestos 3-yr Re-Inspections / 6 Mo. Surveillance
- Campuses with known or suspect asbestos-containing material (ACM) will be re-inspected every
three years by a Texas licensed asbestos inspector.
- The head custodian and/or his/her designee will perform (and document) a surveillance of all
accessible ACM. This surveillance with be performed and documented every April 13th and
October 13th.
- Damaged ACM should be noted on the surveillance form as well as the work order number
issues to correct the problem.
- Ensure work orders involving known or suspect ACM are reported as asbestos work orders.
- A scanned or faxed copy should be sent to Environmental Programs and the original report
placed in Tab 3 of the campus AMP.
Asbestos Training